Barton Wind Farm 161 kV Substation Commissioning

< Back to projects

Client: Iberdrola Renewables
Location: Iowa, USA

POWER provided commissioning and acceptance testing for a new 161 kV substation and collector facility at Barton Wind Farm. Equipment testing included SF6 breakers, capacitor banks, grounding transformers, CCVTs, 69 kV bus and metering CT/PTs. Due to construction delays the project scope was modified. Changes made in the field required POWER to re-perform point-to-point wire verification and functional testing.