Msenge Emoyeni Wind Farm Floodline Study

< Back to projects

Client: Windlab Systems Pty Ltd
Location: Port Elizabeth, South Africa

POWER managed a floodline study of the 100-year flood plain in and adjacent to the planned Msenge Emoyeni 140 MW wind farm north of Port Elizabeth in the Eastern Cape. POWER teamed with Arup (Pty) Ltd for the survey, which will help determine water crossing infrastructure requirements within the wind farm and assist in the overall site civil design of the project.